Pipeline Construction

The goal of raising the production levels of our clients in the San Tomé District – Ayacucho Division, was achieved through the installation of a 12-inch pipeline for block A of the Petrovictoria joint venture, which was connected to one of 30 ” that works as a head to optimize the oil flow.

Associated
barrels

| Project Details

The goal of raising the production levels of our clients in the San Tomé District – Ayacucho Division, was achieved through the installation of a 12-inch pipeline for block A of the Petrovictoria joint venture, which was connected to one of 30 ” that works as a head to optimize the oil flow.

This work, which we carried out with skilled labor, consisted of the migration of seven wells to collection pipes and a broader pipeline, taking full advantage of the productive potential of the deposits.

With the construction of a 12 ”pipeline and its connection to a 30” one, we optimize the crude oil flow, raising the production levels of our clients.

Before these works, the wells produced between 3,700 and 3,800 barrels per day, and with the start-up of this new system, we managed to increase production to 7,000 barrels per day.

This project also included the construction of 1.1 kilometers of pipeline, construction of a 12 ”production manifold in the macolla, and the construction of a 6” test and diluent manifold.

To these works are added the construction of bayonets for 15 wells, the reconnection of seven wells and the hydrostatic test on 12 ”, 6” and 2 ”inch lines.

| Project Overview

The goal of raising the production levels of our clients in the San Tomé District – Ayacucho Division, was achieved through the installation of a 12-inch pipeline for block A of the Petrovictoria joint venture, which was connected to one of 30 ” that works as a head to optimize the oil flow.

| Project Gallery

| Project Description

| Contact Us