This project, called Temporary Production Facility Services for wells in Macolla 21, corresponding to the Petromonagas Operation Center, included the connections for the incorporation of four wells into the production stream.
This project, called Temporary Production Facility Services for wells in Macolla 21, corresponding to the Petromonagas Operation Center, included the connections for the incorporation of four wells into the production stream.
In the San Tomé District – Ayacucho Division, we also incorporate tanks and vaccine units for the transport of fluids.
Likewise, the construction of temporary lines to clean wells made it possible to increase the volume of crude oil that emanates from the fields and increase the oil production of Rosneft’s subsidiaries in Latin America.
The tasks included the design of early constructions, through the installation of frac tanks or fractionation tanks for collection, as well as the construction and repair of pipelines that transfer the crude oil to the main trunk.
This project, called Temporary Production Facility Services for wells in Macolla 21, corresponding to the Petromonagas Operation Center, included the connections for the incorporation of four wells into the production stream.